
Phase 3 survey results revealed

Thank you to all Testerton, Hurstway and Barandon Walk residents who were asked to co-design the final detailed design of their blocks. They were provided with a survey asking them for their comments and feedback on the designs and proposals.
We asked specifically for their preferences on refurbishment elements, including balcony doors, external wall insulation (EWI) design, and more. Lancaster West Neighbourhood Team have collected the results and we can now reveal the chosen options.
54% of walkway residents completed the survey.
We proposed. Residents chose...
Balcony doors: Two central doors Roof terrace covering: Glazed canopy
External wall insulation: Full pattern design
Waste management: Distance was the most important consideration for waste disposal
You can find out more about the different options chosen by residents below.
We asked specifically for their preferences on refurbishment elements, including balcony doors, external wall insulation (EWI) design, and more. Lancaster West Neighbourhood Team have collected the results and we can now reveal the chosen options.
54% of walkway residents completed the survey.
We proposed. Residents chose...
Balcony doors: Two central doors Roof terrace covering: Glazed canopy
External wall insulation: Full pattern design
Waste management: Distance was the most important consideration for waste disposal
You can find out more about the different options chosen by residents below.